SIBS Maintenance Work Order Status (Updated 9/4/02)

School

Location

Date 
Submitted

Request

Status

Anticipated
Date of Completion

FTMS Kitchen 1/17/02 Floor by 3rd bay sink needs repair, cover hole in wall were pipes go through, remove & replace gasket on freezer door. Approved Summer
FTMS 204 4/10/02 Glue molding piece on outside of door. Approved 6/30/02
FTMS 167 5/30/02 Finish installing cable in classrooms. Approved 6/30/02
FTMS Kitchen 5/31/02 Repair broken proof box. Approved 6/30/02
SBHS Boys locker room 11/28/01 Light shade broken. Approved Summer
SBHS 206 12/6/01 Wall in bathroom needs to be patched & painted. Approved Summer
SBHS 237 1/8/02 Shade is missing. Approved Summer
SBHS 236 1/8/02 Shade broken. Approved Summer
SBHS Science Rooms 1/8/02 Lab table equipment drawers need locks replaced. Approved 6/30/02
SBHS Outside of 233 1/11/02 Security light is not working. Approved 6/30/02
SBHS 231 1/15/02 Hole in wall in small work room. Approved Summer
SBHS Small Elevator 1/15/02 Light inside not working. Approved 6/30/02
SBHS 224/225 2/12/02 Remove non-functioning window AC units.  Replace with glass. Approved Summer
SBHS Girls Track Locker Room 3/14/02 Attach girls to door of locker room. Approved 6/17/02
SBHS Library 4/9/02 Recover table with new laminate. Approved Summer
SBHS Auditorium 4/10/02 Lights out in ceiling. Approved Summer
SBHS Auditorium 5/19/02 2 ballasts are burned on stage. Approved 6/30/02
SBHS Outside 5/21/02 Place posts for east walkway for HS & MS, prep & re-seed lawn. Approved By June 15
SBHS Band Room 5/22/02 Emergency light is out. Approved 6/30/02
SBHS Penthouse 5/30/02 Correct piping, not working properly. Approved 6/30/02
SBHS Nurse's Bathroom 6/4/02 Toilet vibrates when flushed. Approved 6/11/02
SBHS Enrichment Center 6/11/02 Install changing table in handicapped bathroom. Approved 8/29/02
SBHS Art Hallway Up 6/13/02 The handle of the gym doors near storage is bent. Approved 6/17/02
Chamberlin Media Center 4/11/01 Complete installation of TVs, VCRs & racks for placement on cement block wall in classrooms. Approved Summer
Chamberlin Kitchen 3/11/02 Pressure release is leaking. Approved Summer
Chamberlin Playground 4/1/02 Need rake & tractor to rake up bark & stones.  Need additional stone. Approved Summer
Chamberlin Front Lobby Area 4/3/02 Check ctu unit, only one speed works. Approved 6/30/02
Chamberlin 15, 3, Cafeteria 4/9/02 Cables pulled in rooms & new outlet. Approved 6/30/02
Chamberlin Cafeteria 5/13/02 Replace 2 3-way switches for 1st set of lights. Approved 6/30/02
Chamberlin 16 5/29/02 Put shelf on wall over computers. Approved Summer
Chamberlin 21 6/6/02 Look at fan, it's quite loud, to see if something can be done. Approved Summer
Chamberlin 6 & 13, Air handler 1 6/12/02 Units not running due to noise & air handler relay clicking on & off. Approved Summer
Orchard South End of Building 9/26/01 Need estimate of feasibility for installing outside water faucet for attending to gardens @ end of building. Approved Summer
Orchard Shed 12/10/01 Need power & light in shed. Approved Summer
Orchard Kitchen 12/13/01 Oven not working properly. Approved 6/30/02
Orchard Outside 1/11/02 Need crushed white stone for path between school & playground. Approved Summer
Orchard Kitchen 1/28/02 Repair/replace floor tiles under dishwasher per health dept. Approved 6/30/02
Orchard Playground 3/19/02 Need more wood chips for playground surface. Approved 6/30/02
Orchard Main Office 3/26/02 Install power outlet. Approved 6/30/02
Orchard Cafeteria & Gym 4/19/02 Install 2 fans & put up lights. Approved 6/30/02
Orchard Boys Bathroom 5/2/02 Install strainers. Approved 6/30/02
Orchard Front Entrance 5/2/02 Repair/replace closer. Approved 6/30/02
Orchard 29 5/3/02 Repair sink & drain. Approved Summer
Orchard Outside 5/10/02 Replace trim around soffit. Approved Summer
Orchard Girl's Bathroom 6/10/02 Parts for the door that's fallen off. Approved 6/14/02
Orchard Outside 6/10/02 Ballasts burned on security lights. Approved 6/14/02
Central Library 6/6/01 Install blinds in library teaching area. Approved 6/30/02
Central Outside Cafeteria 3/11/02 Replace ballasts. Approved 6/30/02
Central Playground 3/11/02 Bring in dirt. Approved Summer
Central Gym Bathroom 4/3/02 Toilet is leaking at handle. Approved 6/30/02
Central Driveway 4/3/02 Put something on sides. Approved 6/30/02
Central Playground 5/29/02 Pea stone for new structure. Approved 6/30/02